[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: D&D Work Hazard Assessment
Dave,
At the Big Rock Point Restoration Project, D&D work activities are controlled through the use of formal decommissioning work packages (DWPs) as prescribed by procedure. As part of the DWP preparation process, DWP job planners are required to perform a job walkdown. A checklist is provided to document this walkdown. The checklist contains a listing of potential hazards to look for during the walkdown such as: environmental challenges, lead paint, energized conduits and circuits, etc. The checklist also identifies permits that will be required such as: tagging, fire, confined space, combustible loading, and radiation work permit.
Leon E. Brown
Staff Consultant
Big Rock Point Restoration Project
231-547-8419
lebrown@cmsenergy.com