[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Posting and Monitoring Requirements @ DOE Facilities
10 CFR 832.402 requires personnel monitoring for people who could
exceed 100 mrem/year.
How does your site ensure the unmonitored personnel do not exceed
the 100 mrem/year requirement?
Please mention any postings and their criteria.
Tom Goff
WIPP ALARA Coordinator
WIPP Integrated Waste Operations
(505) 234-8861
(fax) 234-8963
e-mail Tom.Goff@WIPP.ws
page (505) 234-8850 (pager 479)
P.O. Box 2078
Carlsbad, NM 88221
Radiological Engineering: Anticipating Problems.....providing solutions!!!
************************************************************************
You are currently subscribed to the Radsafe mailing list. To
unsubscribe, send an e-mail to Majordomo@list.vanderbilt.edu Put the
text "unsubscribe radsafe" (no quote marks) in the body of the e-mail,
with no subject line. You can view the Radsafe archives at
http://www.vanderbilt.edu/radsafe/