Mccormick, Luke I luke.mccormick at dhs.gov
Thu May 5 20:31:53 CEST 2005





Get a copy of the USACE HSP for sampling at the Navajo Abandoned Uranium
Mines Sites. Make sure they  make the correct site specific addiitions.

____________________Reply Separator____________________
Subject:    [ RadSafe ] Health and Safety Plan needed for TENORM fiel...
Author:     radsafe-bounces at radlab.nl
Date:       5/5/2005 1:27 PM

       Subject:
       [ RadSafe ] Health and Safety Plan needed for TENORM field
       sampling
       ---------------------------------



       Radsafers,
       We have been approached by a contractor working with the U.S.
       Fish and
       Wildlife Service who is seeking a Health and Safety Plan for
       field sampling
       on FWS property near old copper mining (and smelting?)
       operations.
       Contaminants reaching the FWS property appear to include
       TENORM, probably
       uranium and its decay products, in addition to heavy metals.
       The FWS is
       requiring a HSP prior to the work being conducted.
       Are any of you aware of a HSP appropriate for these
       circumstances?

       Jim Otton


       _______________________________________________
       You are currently subscribed to the radsafe mailing list
       radsafe at radlab.nl

       Before posting a message to RadSafe be sure to have read and
       understood the RadSafe rules. These can be found at:
       http://radlab.nl/radsafe/radsaferules.html

       For information on how to subscribe/unsubscribe and other
       settings visit: http://radlab.nl/radsafe/

.



More information about the radsafe mailing list