[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
9/5 TRO DER INDEX
9/5 TRO DER Index(sm) - 95th Issue
NOTE TO THOSE ON THE NUC-OPS LIST WHO ARE *NOT* ON THE TRO LIST.
If you'd like to try out the TRO Daily Report (a daily electronic
newsletter), please email me at paul.smith@trobb.com to get on the TRO list.
Once you're on the TRO list, it's easy to get off if it's not for you.
NRC's 9/5/95 Daily Event Report (DER) included the following DERs:
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29265 |
|FACILITY: COOK REGION: 3 |LAST UPDATE DATE: 09/02/95 |
+----------------------------------------------------------------------------+
| IMPROPER INSTALLATION OF THE SEAL ASSEMBLIES ON ELECTRICAL CONNECTIONS TO |
| TWO REACTOR VESSEL HEAD VENT SOLENOID VALVES. |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29268 |
|FACILITY: OCONEE REGION: 2 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| TECHNICAL SPECIFICATION REQUIRED SHUTDOWN BECAUSE A 72-HOUR LIMITING |
| CONDITION FOR OPERATION FOR AN INOPERABLE BACKUP POWER SUPPLY WAS EXCEEDED.|
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29269 +
|FACILITY: NINE MILE POINT REGION: 1 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| THE PLANT HAD A MANUAL REACTOR SCRAM FROM 26% POWER. |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29270 +
|FACILITY: ZION REGION: 3 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| UNIT 1 ENTERED TECHNICAL SPECIFICATION 3.0.3 DUE TO LOW AIR PRESSURE ON |
| ZONE 4 ISOLATION VALVE SEAL WATER TANK. |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29271 |
|FACILITY: PERRY REGION: 3 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| UNPLANNED REACTOR CORE ISOLATION COOLING (RCIC) INITIATION SIGNAL DURING |
| RESTORATION OF DIVISION 2 POWER SUPPLY. |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29272 |
|FACILITY: INDIAN POINT REGION: 1 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| UNIT SHUTDOWN AS A RESULT OF A LOSS OF THE CAPABILITY TO INITIATE A |
| FEEDWATER ISOLATION SIGNAL FROM A REACTOR TRIP WITH A LOW REACTOR COOLANT |
| SYSTEM TEMPERATURE CONDITION DUE TO A FAILED RELAY |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29273 |
|FACILITY: HARRIS REGION: 2 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| UNPLANNED AUXILIARY FEEDWATER ACTUATION DURING TESTING DUE TO A PROCEDURAL |
| PROBLEM |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29274 |
|FACILITY: ARKANSAS NUCLEAR REGION: 4 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| REACTOR TRIP ON HIGH STEAM GENERATOR LEVEL DUE TO THE INCREASE IN FEEDWATER|
| PUMP SPEED WHEN A PAINTER INADVERTENTLY VENTED THE 'B' MAIN FEEDWATER |
| HEADER FLOW TRANSMITTER |
+============================================================================+
+============================================================================+
|FUEL CYCLE FACILITY |EVENT NUMBER: 29275 |
|FACILITY: BABCOCK & WILCOX CO. |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| THE AMOUNT OF URANIUM-235 STORED IN A UNIT OF A STORAGE RACK ASSOCIATED |
| WITH THE SCRAP MATERIAL RECOVERY OPERATION AT B&W NAVAL NUCLEAR FUEL |
| FABRICATION FACILITY IN LYNCHBURG, VIRGINIA, EXCEEDED THE ADMINISTRATIVE |
| LIMIT OF 350 GRAMS AS STIPULATED IN GENERIC LETTER 91-01. |
+============================================================================+
+============================================================================+
| GENERAL INFORMATION or OTHER |EVENT NUMBER: 29276 |
| CITY: ST. PETERSBURG REGION: 2 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| RESOURCE RECYCLING (A SCRAP METAL PROCESSING BUSINESS) OF ST. PETERSBURG, |
| FLORIDA, IDENTIFIED AND CONTAINED A RADIOACTIVE SOURCE IN EXCESS OF FIVE |
| MICRO-ROENTGENS PER HOUR ON CONTACT |
+============================================================================+
+============================================================================+
|OTHER NUCLEAR MATERIAL |EVENT NUMBER: 29277 |
|LICENSEE: NORTH STAR STEEL COMPANY |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| NORTH STAR STEEL COMPANY OF YOUNGSTOWN, OHIO, ACCIDENTALLY POURED LIQUID |
| STEEL OVER THE TOP OF A 1,000 MILLICURIE CESIUM-137 SOURCE |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29278 |
|FACILITY: BRAIDWOOD REGION: 3 |LAST UPDATE DATE: 09/01/95
+----------------------------------------------------------------------------+
| POTENTIAL DEGRADED CONDITION FOR THE SAFETY INJECTION SYSTEM DUE TO |
| CONFLICTING OPERABILITY DETERMINATIONS |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29279 |
|FACILITY: SALEM REGION: 1 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| UNUSUAL EVENT DECLARED DUE TO THE TRANSPORT OF A POTENTIALLY CONTAMINATED |
| INDIVIDUAL OFFSITE TO AN OFFSITE MEDICAL FACILITY |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29280 |
|FACILITY: BROWNS FERRY REGION: 2 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| INADVERTENT AUTOMATIC START OF ALL UNIT 3 EMERGENCY DIESEL GENERATORS WHILE|
| BOOTING A RELAY CONTACT DURING SCHEDULED SURVEILLANCE TESTING |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29281 |
|FACILITY: ARKANSAS NUCLEAR REGION: 4 |LAST UPDATE DATE: 09/01/95 |
+----------------------------------------------------------------------------+
| OFFSITE NOTIFICATIONS OF POTENTIAL FUEL OIL IN THE DISCHARGE CANAL. (REFER|
| TO EVENT NUMBER 29285.) |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29282 |
|FACILITY: LIMERICK REGION: 1 |LAST UPDATE DATE: 09/02/95 |
+----------------------------------------------------------------------------+
| UNIT COMMENCED SHUTDOWN IN ACCORDANCE WITH PLANT TECHNICAL SPECIFICATIONS. |
+============================================================================+
+============================================================================+
|POWER REACTOR |EVENT NUMBER: 29283 |
|FACILITY: LIMERICK REGION: 1 |LAST UPDATE DATE: 09/02/95 |
+----------------------------------------------------------------------------+
| TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO INOPERABILITY OF A |
| POST-LOCA HYDROGEN RECOMBINER FOR MORE THAN 30 DAYS. |
+==
=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=
Paul Smith <paul.smith@trobb.com> (510) 547-0598 <FREE BBS, 8N1>
The Readiness Operation, Inc. (510) 547-0594/0920 <voice/fax>
What's a "Mailbot" for? Send any message to mailbot@trobb.com to
learn what they are, how to use them, and how to get one. Send any
msg to infofile@trobb.com for info on 1,000s of NRC docs: FREE.
"Bit by bit and byte by byte, building the Utility InfoMarketplace"