[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
DOE Price-Anderson Enforcement Actions
DOE directly links every enforcement action to a violation of one or
more requirements in 10 CFR 830 or 10 CFR 835. Each violation is
described in detail in a Preliminary Notice of Violation that is sent
to a contractor after an enforcement conference has been conducted.
The contractor then has the option to either challenge the PNOV or
accept it.
What was posted on RadSafe looks like excerpts from press releases
DOE issues after a contractor accepts the findings of a PNOV. The
press releases simply highlight the events surrounding a violation
and tend to be the most visible means of "announcing" a Notice of
Violation.
DOE's Office of Enforcement and Investigation (EH-10) does, though,
have a web site that has available each PNOV that has been issued to
date. The web site's address is:
http://tis-nt.eh.doe.gov/enforce/