[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RADSAFE digest 3135



All,
This may be late but...
Yucca Mountain is not supposed to be a temporary location.  It is a
permanent repository for high level waste.  There was a bill, recently
vetoed, that would have provided a temporary repository in the same area.
Mark Somerville
Certified Health Physicist
PG&E Diablo Canyon Power Plant
Senior Radiation Protection Engineer
NVLAP Technical Director
(805) 545-4007
mailto:mos3@pge.com


************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html