[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Ludlum 43-37 Floor Monitor Procedure




I need to create a operation/calibration procedure for a Ludlum 43-37 floor
monitor.  I'll probably use the unit in conjunction with Ludlum 2221 meters (one
set up for alpha and another set up for beta/gamma).  I would appreciate any
advise or preferably copies of procedures from other users of this or
similar-type floor monitor.

Thanks in advance,

Rodney Bauman, CHP, RRPT
Weldon Spring Site Remedial Action Project
rodney_bauman@wssrap-host.wssrap.com
(636) 441-8086 ext. 4219
fax: (636) 926-7072

************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html