Re: Design of Nuclear Power Plants
Just one slight disagreement:
I feel that any adequately trained Nuclear Engineer would have
recognized the danger and shut down the operation long before the
system became unsafe. A review of the "minutes" (the operator's
chronology) of the accident shows that the tests could not be
performed without leaving the reactor in a dangerously unstable
situation. Instead of stopping, they continued to override the
safety systems.
Wes
> Date: Wed, 1 May 96 11:22:46 -0500
> Reply-to: radsafe@romulus.ehs.uiuc.edu
> From: "Cuttler, Jerry" <CuttlerJ@spkb.candu.aecl.ca>
> To: Multiple recipients of list <radsafe@romulus.ehs.uiuc.edu>
> Subject: Re: Design of Nuclear Power Plants
> The operating procedures did not forbid such operation.
> Had this mode of operation been analyzed in advanced, this weakness would
> have been identified. Hindsight is 20/20.
>
> Jerry Cuttler
> Canadian Nuclear Society
*********************************************************************
Wesley M. Dunn, C.H.P. 512-834-6688
Deputy Director, Licensing 512-834-6690 (fax)
(Texas) Bureau of Radiation Control wdunn@brc1.tdh.state.tx.us
*********************************************************************