[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
updated ufsar
Dear Radsafers:
Question specifically for the Nuc Power Plant Personnel.
I have been out of the Power Loop for a while, I was wondering
if in your current UFSAR, you use EPA /Federal Guidance Report 11
for dose calculations in chapter 11 and 15?
I was also wondering about Reg Guide 1.109 revisions.
If you send to me directly, I can summarize the results or not
as you specify.
--
Roy C. Craft CHP
1707 Pecan St.
Bay City, TX
77414
rcraft@tgn.net
(409)245 9991