BWR Long Duration Shutdowns





Clinton Station (BWR-6) is preparing to restart following a long duration
shutdown in excess of 2 years.

We are interested in talking with other BWRs that have experienced similar
shutdowns with the idea of obtaining lessons learned during the restart. The
focus is from the Radiation Protection perspective.

Please contact me directly if you have some experiences to share in this area.

Harry Anagnostopoulos, CHP
Radiation Protection Manager - Acting
Clinton Power Station
(217) 935-8881  x4213
Harold_Anagnostopoulos@illinova.com


************************************************************************