[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: TLD inspections








Brian Gaulke
03/02/99 10:33 AM

Dan Leddy wrote:

For TLD processors, I appreciate your answer to the follow 2 questions:
1.  Do you perform a physical inspection of each TLD when you do initial
element correction factor calibration?
2.   Do you perform a physical inspection of each TLD when you do element
correction factor re-calibration?

We do a 100% visual inspection prior to initial calibration.  We do not do
an inspection specifically for recalibration .  However, we do a cursory
inspection of all dosimeters upon receipt from clients, and a more detailed
inspection whenever a glow curve anomaly indicates a potential problem.

Brian R. Gaulke, CHP
Head, Dosimetry Section
Radiation Protection Bureau
Health Canada
(613) 941-0143
Brian_Gaulke@hc-sc.gc.ca


************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html