[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
D&D of Buildings using Volumetric Criteria
Dear Radsafers,
The traditional method of decommisioning a building is to use surface
contamination limits (e.g., NUREG 1.86 limits or dose based derived values
using dose modeling codes such as RESBUILD or DandD) before the building is
demolished or released. An emerging option being investigated in the
industry is the use of volumetric release criteria (e.g. pCi/g) for the "free
release" or on-site disposal of concrete rubble and/or building debris
following demolition of the building/structure.
I am gathering information about the use of this emerging method. Are there
any DOE or DOD facilities or NRC licensees that have used this or a similar
method for a decommisioning project? Does anyone know of a good person to
talk to, particularly at a DOE facility, who may have some insight? I am
specifically looking for contacts so that I can perform a brief telephone
survey to gather information. Replies can be sent to the email address
listed below.
Thanks everyone,
Jim
Jim Blute
Health Physicist
Duke Engineering and Services
jjblute@dukeengineering.com
************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html