[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Dosimetry Questions



 
Calvert Cliffs Nuclear Power Station is interested in responses to the following two questions.  You can either reply to me via email (timothy.j.kirkham@bge.com) or phone (410-414-5519).  Thanks in advance!
 
Question 1 -
For NRC personnel visiting the site (entering the RCA during the visit), 
    1.     Do they required an entry/exit whole body count?
    2.    If they do not require a whole body count, then how is this waived?
            (i.e. using passive monitoring)
    3.     Are they required to provide a current year NRC Form 4 information?
    4.     If a Form 4 is required,  do you request 1)  an estimate or record from
            licenses visited during the current year or 2) simply record NRC as
            licensee from x date to y date?
 
Question 2 -
Regarding Neutron Bubble Detectors -
    1.    Whom among you use bubble detectors?
    2.    Who uses them for neutron record dose?
    3.    Do you have a technical basis for using them instead of your normal TLD?
Tim J. Kirkham
Health Physicist