> Note that the "hefty 55 million kilowatt hours" attributed below to the 32
> wind turbines "behind" dikes on the coast translates to only about 6
> megawatts capacity, or less than 1% of a single 1,000-megawatt nuclear
> generating station.
> A lot more of these would be required for any significant nuclear generating
> resource replacement, along with some very fancy extension cords to pipe
> that electricity from sea-based windmills efficiently without impeding
> navigation.
>
> Bob Hearn
Or: Less than 2 days operation of a large nuclear plant.
E.g., a smaller plant, Seabrook, produced 333 Million kWh, July 1-12.
(While Ray Shadis has produced...?! :-)
Regards, Jim
===========
************************************************************************