RE: DB to test for leaks
>The
seven-day power-up test, which the company wants to do in late December,
involves reloading the fuel rods, bolting down the reactor's new lid, and
>turning on the coolant-circulating
pumps. The pumps' heat and the natural decay of the radioactive fuel will bring
the reactor to its normal operating temperature and
>pressure
1) This
hydrostatic test is performed at all reactors after refueling. This is
nothing special, although in this article they may want it to appear that
way.
2) The amount of
heat added be the fuel is insignificant. The reason the primary heats up
is one reason alone. The pumps.
Michael D. Kent RRPT