Question on Plutonium Facility D&D
I have a question for individuals experienced with the D&D of Plutonium
processing facilities.
We are currently sampling, draining and removing process lines/tanks
from our old Pu product purification cell. This is a concrete cell, so
the work has been with individuals performing all hands on work.
We are looking for ideas on radiological controls that we may not have
thought of yet.
1. Some lines have PH of less than one, did you experience similar
liquids and what chemical controls did you use?
2. Did you drain lines into a sealed system or an open system.
3. After you drained the lines did you coat the inside of the lines
prior to cutting, remember, this is hands on work.
4. What was your cutting method? Our lines are ½" stainless.
5. How did you set up your work area ventilation. We currently pull
air away from the cut area through a 6-8" flex vent duct drawing from
our main plant ventilation system.
We are about 1/3 the way complete with the cell and have run into lines
with this PH and Am-241 activity (complete isotopic analysis is not
complete yet for this liquid) on the order of 1.00 E+4 uCi/mL.
Any comments or ideas will be appreciated and thank you in advance for
any input.
Dave Biela, Radiological Engineering
West Valley Nuclear Services
************************************************************************
You are currently subscribed to the Radsafe mailing list. To unsubscribe,
send an e-mail to Majordomo@list.vanderbilt.edu Put the text "unsubscribe
radsafe" (no quote marks) in the body of the e-mail, with no subject line.
You can view the Radsafe archives at http://www.vanderbilt.edu/radsafe/