[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: planned special exposures?



>     So, the PSE is a loophole that has not been used, at least within the 
>     commercial nuclear utilities.
>     
>     Sandy Perle
>     Supervisor Health Physics
>     Florida Power and Light Company

I think it's fair to say that no utility wants to be the first to try a PSE,
with all the NRC attention and the press response that could follow. Based
on the public relations aspects alone, I think very unlikely that the power
reactor industry will pioneer this feature in the regulation.
Bob Flood
Unless otherwise noted, all opinions are mine alone.
(415) 926-3793
bflood@slac.stanford.edu