Re: N.U Must Pay For Decommissioning -Reply



CLAUDE A. FLORY wrote:
> 
> NU had set aside money for decommissioning, I believe somewhere in the range of
> $200-250M.  But the plant was shutdown prematurely and the cost of
> decommissioning is higher than first estimates. It was economics, not
> incompetence, which shut Connecticut Yankee down.  Gas is a whole lot cheaper
> now than redundant safety systems.  NU lost when it came to "A Connecticut
> Yankee in a Keen Actuary's Count."  TA DUM!
> 
> Claude Flory
> Northeast Utilities
> floryca@gwsmtp.nu.com
> 
> >>> "Sandy Perle" <sandyfl@earthlink.net> 09/02/98 10:56am >>>
> While at FPL, I was involved with the decommisioning plans for
> Turkey Point and St. Lucie. That was late 70's and early 80's.
> Since then, I have understood that the NRC has required, as well
> as other financial regulatory bodies, that each utility had to set
> aside so many $$$ for future decommisioning. Perhaps someone
> can address what NU was trying to push is different from what was
> expected when decommisioning plans were first introduced.
> --------------------
> 
> N.U Must Pay For Decommissioning - (HARTFORD) -- A judge has
> ordered Northeast Utilities to foot the entire bill for
> decommissioning of the Connecticut Yankee Nuclear Power Plant.
> It will cost N-U more than 420- Million dollars to permanently shut
> the plant down. The judge ruled N-U's incompetence led to the
> plant's failure. The utility had wanted to add a surcharge to
> ratepayers' bills to pay part of the cost.
> 
> ------------------
> Sandy Perle
> Technical Director
> ICN Dosimetry Division
> ICN Plaza
> 3300 Hyland Avenue
> Costa Mesa, CA 92626
> Office: (800) 548-5100 x2306
> Fax:    (714) 668-3149
> 
> sandyfl@earthlink.net
> sperle@icnpharm.com
> 
> ICN Dosimetry Website:
> http://www.dosimetry.com
> 
> Personal Website:
> http://www.geocities.com/CapeCanaveral/1205
> 
> "The object of opening the mind, as of opening
> the mouth, is to close it again on something solid"
>               - G. K. Chesterton -
> 
> The opinions expressed are solely, absolutely, positively, definitely those of
> the author, and NOT my employer
> ************************************************************************
> The RADSAFE Frequently Asked Questions list, archives and subscription
> information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html
> 
> ************************************************************************
> The RADSAFE Frequently Asked Questions list, archives and subscription
> information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html
Sorry to differ in opinion with you Claude CY was shut down by NU's
incompetence.....
************************************************************************