[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: Clarification to D&D for Plutonium Areas
rnross@bcsc02.gov.bc.ca
Oh good - put my foot in it again. So you are not going to do the work or
plan the work - just plan it roughly for a cost estimate and then someone else
is going to oversee the project ie the d&D and construction etc.?
Radiation Protection, Ministry of Health, British Columbia
The opinions and material above are solely those of the author.
This is a disclaimer for postings to bulletin boards, news
groups, etc., on the internet.
*** Forwarding note from RADSAFE --INTERNET 04/19/95 09:34 ***
Received: from postoffice.cso.uiuc.edu by BCSC02.GOV.BC.CA (IBM VM SMTP V2R2)
with TCP; Wed, 19 Apr 95 09:34:41 PDT
Received: from romulus.ehs.uiuc.edu (romulus.ehs.uiuc.edu [128.174.74.24]) by
postoffice.cso.uiuc.edu (8.6.12/8.6.12) with SMTP id LAA13448; Wed, 19 Apr 199
5
11:33:33 -0500
Received: by romulus.ehs.uiuc.edu (NX5.67d/NeXT-2.0)
id AA26701; Wed, 19 Apr 95 11:33:24 -0500
Date: Wed, 19 Apr 95 11:33:24 -0500
Message-Id: <9504191634.AA07995@eaglerock.if.scientech.com>
Errors-To: melissa@romulus.ehs.uiuc.edu
Reply-To: radsafe@romulus.ehs.uiuc.edu
Originator: radsafe@romulus.ehs.uiuc.edu
Sender: radsafe@romulus.ehs.uiuc.edu
Precedence: bulk
X-Listserver-Version: 6.0 -- UNIX ListServer by Anastasios Kotsikonas
X-Comment: Radiation Safety Distribution List
I was asked to clarify that this is for existing facilities which are to be
D&D'd. This conceputual plan is to to provide enough information for
obtaining a cost estimate to actual do the work at a later date. The
details for estimate can be plus or minus 30%. I need to ID a plan to do
the work for the future design of D&D.
I hope this helps
Kirk Russell
krr@if.scientech.com
>Kirk Russell writes:
>
>>I have been tasked with conducting a conceptual design plan with ultimate
>>decontamination and decommissioning of two faciliites.
>
>Please clarify for us radsafers, do you mean you are designing a new
>facility and are only including a D&D *plan* in the design for a long time
>in the future? Or do you mean an existing facility needs D&D *now* so that
>your planned facility can be constructed in/on the location of the now-hot
>areas?
>
>Thanks,
>Albert Lee Vest The Ohio State University
>Health Physicist B-042 Graves Hall
>(614)292-0122 333 West 10th Avenue
> Columbus OH 43210
>My employer did not review or approve this message.