[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Shipping question



<< I believe the language in 49 is that the package must be "capable" of
meeting the test criteria.>>

There are two "levels" of testing mentioned in the transport regs or 
supporting documentation: capability testing and performance testing. 
Capability testing reefers to Excepted Packages and prior transport history 
(of the same package configuration) is adequate for documentation.  
Performance testing refers to formal compliance with 49 CFR 173.461, and is 
for Type A packages or above and IP-2/3's. 

Charles Smith
arminc01@aol.com 803.926.8558
Next RAM Transport and Disposal Seminar: September 20-24, Knoxville
http://armnet.com/armonline

************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html