[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Bio David Lochbaum, UCS



The following (reformatted from MSWord document) was sent to me by Mr. 
Lochbaum.

Dave Lochbaum
Nuclear Safety Engineer
Union of Concerned Scientists

Experience Summary

10/96 to date   Nuclear Safety Engineer, Union of Concerned Scientists

            Responsible for directing UCS's nuclear safety program, for 
monitoring developments in the nuclear industry, for serving as the 
organization's spokesperson on nuclear safety issues, and for initiating 
action to correct safety concerns.

11/87 to 09/96  Senior Consultant, Enercon Services, Inc.

            Responsible for developing the conceptual design package for the 
alternate decay heat removal system, for closing out partially implemented 
modifications, reducing the backlog of engineering items, and providing 
training on design and licensing bases issues at the Perry Nuclear Power 
Plant.
    
            Responsible for developing a topical report on the station 
blackout licensing bases for the Connecticut Yankee plant.

            Responsible for vertical slice assessment of the spent fuel pit 
cooling system and for confirmation of licensing commitment implementation at 
the Salem Generating Station.

        Responsible for developing the primary containment isolation devices 
design basis document, reviewing the emergency diesel generators design basis 
document, resolving design document open items, and updating design basis 
documents for the James A. FitzPatrick Nuclear Power Plant.

        Responsible for the design review of balance of plant systems and 
generating engineering calculations to support the Power Uprate Program for 
the Susquehanna Steam Electric Station.

        Responsible for developing the reactor engineer training program, 
revising reactor engineering technical and surveillance procedures and 
providing power manuevering recommendations at the Hope Creek Generating 
Station.

        Responsible for supporting the lead BWR/6 Technical Specification 
Improvement Program and preparing licensing submittals for the Grand Gulf 
Nuclear Station.

03/87 to 08/87  System Engineer, General Technical Services

        Responsible for reviewing the design of the condensate, feedwater and 
raw service systems for safe shutdown and restart capabilities for the Browns 
Ferry Nuclear Plant.

08/83 to 02/87  Senior Engineer, Enercon Services, Inc.

        Responsible for performing startup and surveillance testing, 
developing core monitoring software, developing the reactor engineer training 
program, and supervising the reactor engineers and Shift Technical Advisors 
at the Grand Gulf Nuclear Station.

10/81 to 08/83  Reactor Engineer / Shift Technical Advisor, Tennessee Valley 
Authority

        Responsible for performing core management functions, administering 
the nuclear engineer training program, maintaining ASME Section XI program 
for the core spray and CRD systems, and covering STA shifts at the Browns 
Ferry Nuclear Plant.

06/81 to 10/81  BWR Instructor, General Electric Company

        Responsible for developing administrative procedures for the 
Independent Safety Engineering Group (ISEG) at the Grand Gulf Nuclear Station.

01/80 to 06/81  Reactor Engineer / Shift Technical Advisor, Tennessee Valley 
Authority

        Responsible for directing refueling floor activities, performing core 
management functions, maintaining ASME Section XI program for the RHR system, 
providing power manuevering recommendations and covering STA shifts at the 
Browns Ferry Nuclear Plant.

06/79 to 12/79  Junior Engineer, Georgia Power Company

        Responsible for completing pre-operational testing of the radwaste 
solidification systems and developing design change packages for 
modifications to the liquid radwaste systems at the Edwin I. Hatch Nuclear 
Plant.


Education

June 1979   Bachelor of Science in Nuclear Engineering, The University of 
Tennessee at Knoxville

May 1980    Certification, Interim Shift Technical Advisor, TVA Browns Ferry 
Nuclear Plant

April 1982  Certification, Shift Technical Advisor, TVA Browns Ferry Nuclear 
Plant


Professional Affiliations

Member, American Nuclear Society (since 1978).
************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html