While at FPL, I was involved with the decommisioning plans for
Turkey Point and St. Lucie. That was late 70's and early 80's.
Since then, I have understood that the NRC has required, as well
as other financial regulatory bodies, that each utility had to set
aside so many $$$ for future decommisioning. Perhaps someone
can address what NU was trying to push is different from what was
expected when decommisioning plans were first introduced.
--------------------
N.U Must Pay For Decommissioning - (HARTFORD) -- A judge has
ordered Northeast Utilities to foot the entire bill for
decommissioning of the Connecticut Yankee Nuclear Power Plant.
It will cost N-U more than 420- Million dollars to permanently shut
the plant down. The judge ruled N-U's incompetence led to the
plant's failure. The utility had wanted to add a surcharge to
ratepayers' bills to pay part of the cost.
------------------
Sandy Perle
Technical Director
ICN Dosimetry Division
ICN Plaza
3300 Hyland Avenue
Costa Mesa, CA 92626
Office: (800) 548-5100 x2306
Fax: (714) 668-3149
sandyfl@earthlink.net
sperle@icnpharm.com
ICN Dosimetry Website:
http://www.dosimetry.com
Personal Website:
http://www.geocities.com/CapeCanaveral/1205
"The object of opening the mind, as of opening
the mouth, is to close it again on something solid"
- G. K. Chesterton -
The opinions expressed are solely, absolutely, positively, definitely those of the author, and NOT my employer
************************************************************************
The RADSAFE Frequently Asked Questions list, archives and subscription
information can be accessed at http://www.ehs.uiuc.edu/~rad/radsafe.html